LSA ANACONDA WASTE WATER TREATMENT PLANT

| Owner |
: US Army Corps of Engineers |
| Employer |
: Zafer Contracting Construction and Trade Inc. |
| Contract Coverage |
: Electrical Instrumentation and Control Systems |
| Contract Date |
: 07 May 2005 |
| Commissioning Date |
: 28 February 2006 |
Elektron Grup Ltd., completed the electrical works including Instrumentation and Control Systems, for Waste Water Treatment Plant at LSA Anaconda Airbase Balad-Iraq, as subcontractor to Zafer Construction Inc.
In the scope of Elektron Group Ltd., engineering and installation services for the following electrical systems were completed;
- 1000 kVA 11/0.4 kV prefabricated metal enclosed transformer substation,
- 1000 kVA diesel generator set including main distribution panel and automatic transfer switch,
- Main Motor Control Center, PLC controls, distribution and local control panels,
- Power and Control Systems cabling and wiring for the complete plant and buildings,
- Fire detection and alarm system with 20 smoke detector, 10 manual button and 6 sounder,
- External lighting system of 6 high masts with 4x400W HPS lighting fixtures,
- Data transmission and communication system with 2 patch panel, FO cables and 30 data points,
- Cathodic protection system with 80 Mg anode, 30 reference electrodes and measurement boxes,
- Grounding and lightning protection systems with 78 earthing electrodes and test pits
|
|


|
|
 |