LSA ANACONDA WASTE WATER TREATMENT PLANT

Owner : US Army Corps of Engineers
Employer : Zafer Taahhüt İnşaat ve Ticaret A.Ş.
Contract Coverage : Electrical Installations
Contract Date : 07 May 2005
Commissioning Date : 28 February 2006
Total Contract Value : $ 190.000

Electron Group Ltd. has completed the electrical installation works of Waste Water Treatment Plant, LSA Anaconda, Balad Iraq as subcontractor to Zafer Construction and Trade Co. Inc.

Within the Elektron Group Ltd. scope, engineering services and labor provided for the supply and installation of,
  1. 1000 kVA 11/0.4 kV metal enclosed transformer substation,
  2. 1000 kVA prime diesel generator set and ATS,
  3. Main MCC, PLC and lighting panel boards and switchboards,
  4. Fire alarm system with 19 optic, 1 heat detector, 10 buttons, 6 horns,
  5. External lighting system with 6 lighting poles and 4x400W HPS fixtures,
  6. Telephone/Data network with 2 patch panels, FO cables and 30 telephone/data point,
  7. Cathodic protection system with 80 Mg anodes, 30 reference electrodes and measuring boxes,
  8. Earthing, grounding and lightning protection systems with 78 grounding rods and test wells.


Copyright © 2005 Elektron Co., Ltd. All rights reserved.