BODRUM TAX OFFICE

| Owner |
: Republic of Turkey Ministry of Finance |
| Employer |
: Tepe Yapı Sanayi A.Ş. |
| Contract Coverage |
: Complete Electrical Installations |
| Contract Date |
: 11 October 1999 |
| Commissioning Date |
: 10 April 2000 |
| Total Contract Value |
: $ 92.000 |
The complete electrical installations of Ministry of Finance Bodrum Tax Office Building has been completed and commissioned under Elektron Group Ltd. contract.
Elektron was responsible for the supply and installation of;
- 400 kVA energy supply and transformer substation,
- 5 main distribution and 10 secondary distribution panels,
- Earthing, grounding and lightning protection systems,
- 1.700 kg cable trays with various cross-sections,
- Power distribution and lighting system with 570 circuits,
- 350W, 4 zone single channel public announcement and background music system,
- Computer network cabling to 49 terminals,
- 8 external/56 internal PABX telephone distribution system,
- 6 button, 10 horn manual fire alarm system,
- 150 kVAR reactive power compensation panel,
- 410 electrical lighting fixtures of various types,
- Car parking and external security lighting systems,
- Installation of 63 kVA stand-by diesel generator, 45 kVA UPS.
|
|


|
|
 |