PATALYA LAKESIDE RESORT HOTEL

| Owner |
: Telesis Telekomünikasyon A.Ş. |
| Employer |
: Telesis/Karin İnşaat A.Ş. |
| Contract Coverage |
: Complete Electrical Installations |
| Contract Date |
: 2 January 1992 |
| Commissioning Date |
: 30 August 1996 |
| Total Contract Value |
: $ 440.000 |
The electrical installations of Lakeside Resort has been started in 1992, and completed under two contracts at August 1996. The resort facilities have 42 double-bed rooms, swimming pool, fitness center, meeting rooms, restaurant-bar, computer room, two squash saloons, pool bar, open air tennis courts, disco, and cafe.
Elektron Group Ltd. has designed, supplied and installed;
- 21 main distribution and 114 secondary distribution panels,
- Earthing, grounding and lightning protection systems,
- 3 channel public announcement and background music system,
- CATV system with distribution to 80 TV outlets,
- Electrical distribution and lighting system with 3.100 circuits,
- 1.870 lighting fixtures of various types,
- CCTV system consisting of 4 fixed lenses, 1 PTZ camera, 2 monitors and 1 video multiplexer,
- 150 exterior lighting poles and fixtures, sports lighting of two tennis courts,
- Analog addressable fire alarm system with 190 sensors, 21 manual alarm buttons, 20 alarm horns.
|
|


|
|
 |