OYAK ZİRVEKENT SECOND STAGE HOUSES

| Owner |
: Oyak İnşaat A.Ş. |
| Employer |
: Oyak İnşaat A.Ş. |
| Contract Coverage |
: Complete Electrical Installations |
| Contract Date |
: 4 December 2000 |
| Commissioning Date |
: 25 August 2003 |
| Total Contract Value |
: $ 390.000 |
Complete electrical works of 178 luxury houses have been completed by Elektron Group Ltd. with Oyak İnşaat Company. Çankaya Zirvekent Housing Project Second Stage houses consist of 3 high-rise, 2 low blocks consisting of 150 flats, 12 duplex apartments and 16 luxury flats.
In this scope, Elektron Group Ltd. completed the supply and installation of,
- Energy distribution with 55 main distribution and 203 secondary distribution panels,
- 12.000 kg. cable trays with various types,
- Power and lighting system of 35.000 Mt. energy cables and 18.000 circuits,
- Low current installation with 40.000 Mt. signal cables and 1.760 telephone outlets,
- Telephone distribution system with 16 manholes, 7 handholes and 1.115 Mt. underground cables,
- 5.000 lighting fixtures of various types,
- Earthing, grounding and lightning protection systems,
- External lighting systems.
|
|


|
|
 |